Lincoln service

EV chargers

If the panel cannot feed it, the quote says the panel comes first.

A charging plug seated in an electric car, with a blue ring around the port.

The problem

A charger someone already bought is not the whole project. A 40 or 50 amp circuit is a real load.

What we do

We check the panel and the path to the parking spot. The circuit is labeled and set to the wire we pulled.

Signs it is time

It fails the same way twice

A repeat trip means the first guess was not the whole fault.

The panel is already full

We will not land a new circuit on a box that has no honest room.

Nobody trusts the labels

If flipping a breaker is a guess, the directory is part of the job.

How a visit goes

01

Look

Panel, route, and the rooms involved. We say what we see before we price it.

02

Write it

Devices, circuits, and permit, in one scope you can approve.

03

Do the work

Then we test it and walk you through what changed.

Price

A range after we look, not a number from the curb. Panel work, long wire runs, and permits are their own lines.

Get a free quote · NE EL-31902. One-year workmanship warranty on devices we install. Gear keeps the manufacturer warranty.

Questions

Do you pull permits?

When Lincoln or Omaha requires one, yes. The inspection is part of finishing.

How long is the power off?

A repair can be minutes. A panel change is a planned window of a few hours, told to you when we schedule.

★★★★★
They told us the panel was the job before they sold us a charger.
Helen P. · Lincoln

Need this looked at?

(402) 123-4567Get a free quote
Back