An electrician in a yellow hard hat routes red cable along a block wall.

Lincoln and Omaha

The work, in the light.

Panels, chargers, and lighting. A written scope before we open the wall.

2008On the job since

5.0From the notes on this page

9 townsBetween Omaha and Lincoln

Recent jobs

All projects

Services

A hand points at breakers in an open panel full of colored wires.

Panel upgrades

The upgrade is a planned day. You know the hours the house will be dark.

  • Panel size and the permit, written before the day starts
  • Breakers labeled in words a guest could use
  • Grounding called out if it has to come along
  • A planned window for the hours the power is off

Typical rangeOften $2,200 to $4,200 before extra grounding

Full details

How a job goes

  1. 01

    Look

    We open the panel and walk the route. You hear what is actually there.

  2. 02

    Write the scope

    Circuits, devices, and permit on one page. You approve it.

  3. 03

    Build it

    Then we test, label, and leave the cover story in plain words.

Reviews

★★★★★
They told us the panel was the job before they sold us a charger.
Helen P. · Lincoln
★★★★★
The new breakers are labeled in words. The upstairs bath is the upstairs bath.
Marcus L. · Omaha
★★★★★
The dining light is on a switch by the door. That was the whole ask.
Denise K. · Waverly

Get a free quote

Need an electrician?

(402) 123-4567Get a free quote