Lincoln service

Panel upgrades

The upgrade is a planned day. You know the hours the house will be dark.

A hand points at breakers in an open panel full of colored wires.

The problem

A full panel with tandem breakers and a directory nobody trusts is how a small add becomes a warm cover.

What we do

The quote names the panel size, the permit, and whether the grounding comes along. Breakers are labeled in words a guest could use.

Signs it is time

It fails the same way twice

A repeat trip means the first guess was not the whole fault.

The panel is already full

We will not land a new circuit on a box that has no honest room.

Nobody trusts the labels

If flipping a breaker is a guess, the directory is part of the job.

How a visit goes

01

Look

Panel, route, and the rooms involved. We say what we see before we price it.

02

Write it

Devices, circuits, and permit, in one scope you can approve.

03

Do the work

Then we test it and walk you through what changed.

Price

A range after we look, not a number from the curb. Panel work, long wire runs, and permits are their own lines.

Get a free quote · NE EL-31902. One-year workmanship warranty on devices we install. Gear keeps the manufacturer warranty.

Questions

Do you pull permits?

When Lincoln or Omaha requires one, yes. The inspection is part of finishing.

How long is the power off?

A repair can be minutes. A panel change is a planned window of a few hours, told to you when we schedule.

★★★★★
The new breakers are labeled in words. The upstairs bath is the upstairs bath.
Marcus L. · Omaha

Need this looked at?

(402) 123-4567Get a free quote